Post-sales EAM · brief day-one
Activate tails. Defend love.
P1 contracted→equipped airline logos · P2 rollout CX on live fleets · P3 price-risk bizav/charter · weekly: net equipped tails & % activated.
Capture inside aviation connectivity (IFC cabin/ops) vs other satcom, ATG/DAS, gate Wi‑Fi / Boingo-class aggregators — not aviation spend alone.
- Net equipped tails
- TBD
- % contracted activated
- TBD
- Company equipped / contracted
- 3.8k / ~12k
- Aviation revenue $
- TBD
Portfolio weekly Δ — not logo count
Equipped ÷ contracted in book
~32% backlog activated (Q3 2026)
Inside Ent & Gov $2.13B; not broken out
Activation funnel
Contracted ≠ equipped ≠ adopted. Track stage counts weekly — portfolio values TBD.
Issue tree A1 · B2
1. Contracted
TBD
MSA live; tails tagged
2. STC ready
TBD
Type / region cert clear
3. In slot
TBD
MRO / heavy-check booked
4. Equipped
TBD
Flying product installed
5. Paying / adopting
TBD
Activated + CX green
Priority contacts
Contact map per logo: economic buyer, IFC lead, MRO slot owner, loyalty/telecom partner, dealer PM. Placeholders until book is tagged.
2 add-value · 2 prevent-loss
Placeholder Airline — contracted backlog
TBD — IFC program lead + MRO slot owner
Program + install delivery
contractedA1 · B2Contracted-but-not-equipped logo: activation is the vertical growth engine (A1).
Next: Weekly activation standup — tails, slots, STC/kit blockers
Placeholder Airline — fleet expand
TBD — CCO / CX + loyalty / telecom partner
Economic buyer + free-Wi‑Fi partner
equippedA2 · A3Expand remaining mainline/regional metal and free-Wi‑Fi sponsorship attach (A2 / A3).
Next: Map remaining tails + partner CX success criteria
Placeholder Airline — rollout CX
TBD — Cabin product / CX + Aviation Ops / NOC loop
CX owner
adoptingB3 · B5Installed fleet in rollout (~Alaska-class pace risk): prevent under-adoption & reputation spillover (B3 / B5).
Next: Flight-reliability + passenger NPS loop; outage escalation path
Placeholder BizAv — 2026 plan shock
TBD — Owner / flight dept + authorized dealer PM
Economic buyer + dealer PM
at-riskB1High-ARPU bizav hit by mid-2026 plan resets; churn / pause-install risk (B1).
Next: Retention war-room call; plan architecture feedback via dealer
Day-one pyramid focus
Priority order from the research brief §8. Highlighted = first 30–60 days.
Focus now: P1 · P2 · P3
- P1
Airlines — contracted → equipped
FocusLargest $ and CX risk. Backlog math (~12k vs ~3.8k company) — EAM owns MSA → flying product.
Stages: contracted · installing
Tails TBDRev TBD - P2
Airlines — installed / rollout CX
FocusLive fleets (e.g. Alaska ~40% equipped late Oct 2026 — third-party pace). Defend B3/B5; enable telecom free-Wi‑Fi partners.
Stages: equipped · adopting
Tails TBDRev TBD - P3
Bizav / charter — high-ARPU book
FocusDefend price-shock churn; dealers as force multiplier; watch dual-source (e.g. NetJets/Flexjet + Gogo).
Stages: equipped · at-risk
Tails TBDRev TBD - P4
MROs / dealers — install capacity
Slot brokerage unlocks A1/A5; capacity bottleneck = EAM risk and opportunity.
Stages: installing
Tails TBDRev TBD - P5
OEM / completion centers
Longer cycle; plant linefit + VIP completion standards (Priority 4).
Stages: contracted
Tails TBDRev TBD - P6
Gov / special missions
Longer cycle; Starshield adjacency TBD for aviation EAM.
Stages: contracted
Tails TBDRev TBD
Risk radar
Top risks from brief: airlines behind install pace, bizav price-shock, support/STC escalations, competitive dual-source.
| Account | Type | Severity | Signal | Competitive pressure | Owner action |
|---|---|---|---|---|---|
Placeholder Airline — behind install pace Airlines · pace-risk · installing | pace-risk | High | Behind stated install cadence; contracted backlog aging into shelfware (B2) | Incumbent IFC still on part of fleet; hybrid keep-competitor risk (B4) | Weekly activation standup; dealer/MRO slot brokerage |
Placeholder BizAv — plan-price shock Bizav · price-risk · at-risk | price-risk | High | 2026 plan hikes (e.g. Global Unlimited list reset); install pause / cancel language in trade press | Gogo Galileo / OneWeb, Viasat, Satcom Direct lineage rip-and-replace | Executive retention outreach; grandfathering / plan options TBD |
Placeholder Airline — rollout CX Airlines · support / CX risk · adopting | support-risk | Medium | Intermittent “Starlink advertised but not working” flight reports; NPS TBD | Passenger expectation set by free high-speed Wi‑Fi peers | Install-quality + NOC loop; reachable human escalation brand |
Placeholder Fractional / charter — dual-source Charter · competitive-risk · equipped | competitive-risk | Watch | Partial fleet Starlink while retaining alternate IFC on other metal | Keep-Gogo / multi-orbit dual-source dynamics | Utilization proof on Starlink tails; displacement watch |
Competitive context
Brief market frame: IFC/satcom core vs ATG, gate/hangar Wi‑Fi, Boingo-class aggregators, and status-quo unconnected fleets — airport Wi‑Fi is TAM-adjacent, not cruise IFC.
Other satcom / IFC
Viasat, Intelsat, Panasonic, Collins, SES; bizav Gogo/OneWeb…
ATG / airborne cellular
Partial overland substitute / hybrid
Gate / hangar Wi‑Fi
Pre/post-flight only — not cruise IFC
Airport aggregators
Boingo-class; TAM-adjacent
No internet (status quo)
Still large for GA / some LCC / APAC